Portfolio Details

Project Overview

Empowering global energy projects with cutting-edge IT infrastructure solutions is at the heart of what we do. At Alitisal Aljadeed, we successfully delivered a comprehensive IT infrastructure implementation for Çalık Enerji’s 1.2 MegaWatt Power Plant Expansion in South Tripoli, Libya. This project supported the construction of a fully functional site camp designed to accommodate 2,000 personnel, integrating advanced technologies for security, communication, and operational efficiency.

Project Information

  • Client Name Çalık Enerji
  • Project Type IT Infestructure
  • Location Libya, Tripoli

Project Objective

The goal of this project was to provide a complete IT infrastructure solution to support the day-to-day operations of Çalık Enerji’s power plant expansion site in South Tripoli. The scope included designing and implementing systems for surveillance, access control, time attendance tracking, and public announcements, ensuring a secure, efficient, and well-managed environment.

Solutions

We implemented a state-of-the-art IT infrastructure tailored to meet the specific needs of the South Tripoli power plant site. Here’s how we did it:

CCTV Surveillance System
  • 64 High-Definition Cameras Installed:
    Featuring a mix of camera types (as per the client’s request) from HikVision, strategically placed for comprehensive coverage.
  • Centralized Monitoring:
    Integrated with security databases for real-time monitoring and management.
Access Control System
Time & Attendance System
Public Announcement (PA) System
Power Backup Solutions

Benefits Delivered

  • Operational Efficiency: Achieved 99.9% operability, ensuring minimal downtime.
  • Enhanced Security: Comprehensive surveillance and tiered access control significantly improved site safety.
  • Accurate Time Tracking: Improved accuracy in employee attendance tracking, leading to efficient payroll processing.
  • Effective Communication: The PA system enabled quick and clear dissemination of information across the site.
  • Incident Management: Real-time notifications during incidents ensured faster response times.
  • User Satisfaction: The ease of use and reliability of the systems led to higher satisfaction among employees and stakeholders.